Project Qualification report
Assessment of Packhouse, Western Cape for environmental assets
| Report reference | PQ-2611-B19B |
|---|---|
| Version | 1.0 |
| Date prepared | 16 Nov 2026 |
| Rules version | As at 10 Nov 2026 |
| Packhouse, Western Cape | |
| Readiness | A: Ready to start5 of 5 |
| Prepared by | Enerlink |
1.Summary
Enerlink's grouped project: being assessed (not confirmed)
Your plant started in the current monitoring period (MP2), but it is larger than 100 kWp, the size the project admits today.
- Best route
- Being assessed (not confirmed)
Carbon credits through Enerlink's grouped project
Enerlink's grouped project for South African solar, under Verra's Verified Carbon Standard. Registration is pending. It takes systems up to 100 kWp; larger ones are being assessed. Read more from Verra's Verified Carbon Standard - Date that matters most
- 31 Jan 2027: MP2 ends (to be confirmed)
- Next step
- Start onboarding with Enerlink
- Readiness
- A: Ready to start5 of 5
- Met: A route is open or being assessed
- Met: Ownership and carbon rights are clear
- Met: Not already claimed, and attributes not sold
- Met: Generation data is available
- Met: The first-generation date is known
- Estimated reductions
- About 1,400 to 1,700 tCO2e a year (estimate)
2.The plant
What you told us.
Table 1. The plant, as you described it
| Owner | Business, site owner |
|---|---|
| Country | South Africa |
| Capacity | 1.2 MW |
| First generation | Feb 2026 |
| Export share | Not grid connected |
| Monitoring | Full history available |
3.Assessment by route
Each route to environmental assets, best first.
Table 2. Routes and status, best first
| Route | Status | What it means for this plant | Condition or next action |
|---|---|---|---|
Carbon credits through Enerlink's grouped projectEnerlink's grouped project for South African solar, under Verra's Verified Carbon Standard. Registration is pending. It takes systems up to 100 kWp; larger ones are being assessed. Read more from Verra's Verified Carbon Standard | Being assessed (not confirmed) | Over 100 kWp: decision by mid-January 2027 (estimate). | Wait for the decision |
Carbon credits through a new grouped projectA new grouped project under Verra's Verified Carbon Standard, for plants that use most of their own power and that the existing project can't take. Possible if we open it. Read more from Verra's Verified Carbon Standard | May be possible | To join, register by 1 Feb 2028. | Register by 1 Feb 2028 |
DERs under the Earth StandardDERs under the Earth Standard: for reporting your solar's impact, not for sale. Decarb issues DERs from metered generation. Read more from Decarb | Open | For reporting your solar's impact, not for sale. | Ask us about reporting |
Renewable energy certificatesRenewable energy certificates: one for each megawatt-hour generated. Being set up, not available yet. A certificate can't be claimed on the same megawatt-hour as a carbon credit. Read more from the I-REC Standard (I-TRACK) | Not available yet | Being set up. | When it is set up |
Carbon credits for grid-connected plantsA carbon project under Verra's VMR0017 method, for plants that export more than half their power. Possible if we open it. Read more from Verra's Verified Carbon Standard | Not available | Exports half or less: a captive plant. | None |